Full metadata record
DC FieldValueLanguage
dc.contributorDepartment of Building Services Engineeringen_US
dc.contributor.advisorChau, Chi Kwan (BSE)en_US
dc.creatorWang, Xin-
dc.identifier.urihttps://theses.lib.polyu.edu.hk/handle/200/11257-
dc.languageEnglishen_US
dc.publisherHong Kong Polytechnic Universityen_US
dc.rightsAll rights reserveden_US
dc.titleEnergy and carbon mitigation design options for undertaking the BEAM plus assessmentsen_US
dcterms.abstractThe construction industry is a major source of energy consumption, and the exploration of building energy-saving measures has been ongoing. In order to encourage the development of energy-efficient buildings, the voluntary environmental assessment program BEAM Plus is widely used in Hong Kong. However, BEAM Plus only gives credits for various energy efficiency options without explaining their priority. This research investigates the priority of various energy-saving options and their attractiveness to developers and designers in terms of energy saving and economic efficiency. A representative office building determined after extensive investigations was used as a baseline building in Hong Kong. The determination of the energy saving strategy was based on the option of earning credit in the BEAM Plus NB v2.0 energy use category. EnergyPlus simulations were used to determine the energy performance of various strategies based upon realistic operating. The initial costs required to implement various energy-saving strategies were ascertained by an detailed market survey and regression analysis. The reduction in CO2 emissions from the conversion of annual energy consumption and the credits earned served as benefits. The initial cost of the additional investment was taken as the cost. The widely used cost benefit ratio was used as an indicator to measure the priority of various energy-saving strategies. It could be found that the reduction of the window-to-wall ratio, shading coefficient and lighting power density have the highest priority due to the lower energy consumption and investment. The design of overhangs and green wall does not have economic benefits and the ability to earn high credit in office buildings.en_US
dcterms.extentxiii, 80 pages : color illustrationsen_US
dcterms.isPartOfPolyU Electronic Thesesen_US
dcterms.issued2021en_US
dcterms.educationalLevelM.Eng.en_US
dcterms.educationalLevelAll Masteren_US
dcterms.LCSHBuildings -- Energy conservationen_US
dcterms.LCSHOffice buildings -- Environmental aspectsen_US
dcterms.LCSHHong Kong Polytechnic University -- Dissertationsen_US
dcterms.accessRightsrestricted accessen_US

Files in This Item:
File Description SizeFormat 
5740.pdfFor All Users (off-campus access for PolyU Staff & Students only)1.13 MBAdobe PDFView/Open


Copyright Undertaking

As a bona fide Library user, I declare that:

  1. I will abide by the rules and legal ordinances governing copyright regarding the use of the Database.
  2. I will use the Database for the purpose of my research or private study only and not for circulation or further reproduction or any other purpose.
  3. I agree to indemnify and hold the University harmless from and against any loss, damage, cost, liability or expenses arising from copyright infringement or unauthorized usage.

By downloading any item(s) listed above, you acknowledge that you have read and understood the copyright undertaking as stated above, and agree to be bound by all of its terms.

Show simple item record

Please use this identifier to cite or link to this item: https://theses.lib.polyu.edu.hk/handle/200/11257