dc.titleResource allocation for workface planning using heuristic rule and mathematical model in building constructionen_US
dcterms.abstractThis research study focuses on improving resource allocation strategies for building construction in Hong Kong. In practice, 6-day construction cycle is a commonly used construction method for constructing concrete building superstructure in which one typical floor of concrete superstructure must be delivered in a week. However, there are challenges of allocating construction resources for executing the 6-day construction cycle.en_US
dcterms.abstractThe project managers define work zones for facilitating resource allocation when delivering 6-day construction cycle. However, the definition of work zones is always based on site experience of project managers without any established heuristic rules, leading to large daily duration fluctuation and low resource utilisation rate. In addition, there are workface constraints, such as, precedence relationship constraints, working space constraints, resource availability constraints, resource arrival constraints, and building regulation constraints, to be considered when allocating resources to construct the superstructures. The project managers are always overwhelmed by accounting for these workface constraints when planning resource workflows. Ignoring these constraints may extend project duration and waste limited resources.en_US
dcterms.abstractComprehensive literature review of resource allocation problems in building construction was conducted to identify the below research gaps: (1) Limited research endeavours considered the impact of defining work zones in the working platform for executing 6-day construction cycles on resource allocation in concrete superstructure construction; (2) Most research endeavours focused on improving the scheduling technique at project level. Limited research endeavours focused on the improvement of detailed scheduling at workface level with consideration of workface constraints in building construction.en_US
dcterms.abstractTo fill the identified research gaps, the research aim is to study how to improve the strategies of allocating limited resources in considerations of defining work zones and workface constraints for building superstructure construction. The research objectives are: (1) To conduct a comprehensive review of resource scheduling and resource allocation; (2) To compare the work content of different building components in two work zones in building construction; (3) To discover any rules for defining work zones to improve resource performance; (4) To define workface constraints in building construction and develop a mathematical model for formulating schedules to allocate limited number of resources in workface constraints.en_US
dcterms.abstractFirst, a literature review of resource constraint scheduling problems in construction was comprehensively conducted. Then, the construction activities and sequences in the 6-day construction cycles were standardised based on the data extracted from the site records and site videos. The work content with respect to the work zone was analysed based on the BIM (building information modelling) model. Second, three heuristic rules: (1) lengths of work zone dividing line; (2) fluctuations of daily duration, and (3) utilisation rates of resource, were proposed. A practical case study of a 40-storey building construction in Hong Kong was used to illustrate the heuristic rules. Third, a linear programming model was developed for formulating resource schedules. The model consists of one objective function and five workface constraints. The objective function is to minimise the project duration, activity start times (for maximising the activity total floats), and resource quantities. The workface constraints are named as precedence relationship constraints, working space constraints, resource limit constraints, resource arrival time constraints, and building regulation constraints. A classic example was used to illustrate the formulation of the linear programming model.en_US
dcterms.abstractThe major discoveries and findings of the research study include: (1) Proposed methods to examine the work content of superstructure construction in particular work zones based on BIM model; (2) Proposed heuristic rules successfully evaluate better work zone scheme with the lesser daily working duration fluctuation and better resource utilisation rate; (3) Proposed mathematical model successfully formulates an optimum resource schedule factoring in workface constraints.en_US
dcterms.abstractThis research study has produced both academic and practical values as expressed below. For academic contributions, first, this research study is the first one which discovered the importance of defining work zones for resource allocation in building construction because the work zones govern the workers' work content in construction cycles; Second, this research study is the first one which proposed the heuristic rules for evaluating work zone schemes for less daily duration fluctuation and higher resource utilisation rate; Third, this research study is the first one which proposed the linear programming model for formulating resource schedules factoring in workface constraints.en_US
dcterms.abstractFor practical contributions, first, this research study provides simple heuristic rules for project managers to define better work zones for better resource allocation rather than purely rely on personal site experience in building construction. As a result of having a better work zone definition scheme, the daily working duration will not be too long such that the site workers will not work overtime; Second, this research study provides better resource schedules for project managers to allocate limited resources in building construction. The optimum resource schedules can be iterated using modern computers. The formulated schedules feature reduced project duration while factoring in workface constraints. The workface constraints are precedence relationship constraints, working space constraints, resource limit constraints, resource arrival time constraints,and building regulation constraints.en_US
dcterms.extentxvi, 123 pages : color illustrationsen_US
dcterms.isPartOfPolyU Electronic Thesesen_US
dcterms.issued2022en_US
dcterms.educationalLevelM.Phil.en_US
dcterms.educationalLevelAll Masteren_US
dcterms.LCSHConstruction industry -- Managementen_US
dcterms.LCSHConstruction industry -- Personnel managementen_US
dcterms.LCSHProduction schedulingen_US
dcterms.LCSHHong Kong Polytechnic University -- Dissertationsen_US
dcterms.accessRightsopen accessen_US

Files in This Item:
File Description SizeFormat 
6209.pdfFor All Users5.42 MBAdobe PDFView/Open


Copyright Undertaking

As a bona fide Library user, I declare that:

  1. I will abide by the rules and legal ordinances governing copyright regarding the use of the Database.
  2. I will use the Database for the purpose of my research or private study only and not for circulation or further reproduction or any other purpose.
  3. I agree to indemnify and hold the University harmless from and against any loss, damage, cost, liability or expenses arising from copyright infringement or unauthorized usage.

By downloading any item(s) listed above, you acknowledge that you have read and understood the copyright undertaking as stated above, and agree to be bound by all of its terms.

Show simple item record

Please use this identifier to cite or link to this item: https://theses.lib.polyu.edu.hk/handle/200/11689