Full metadata record
DC FieldValueLanguage
dc.contributorDepartment of Civil and Environmental Engineeringen_US
dc.contributor.advisorChan, Tak-ming (CEE)en_US
dc.creatorDebnath, Partha Pratim-
dc.identifier.urihttps://theses.lib.polyu.edu.hk/handle/200/11812-
dc.languageEnglishen_US
dc.publisherHong Kong Polytechnic Universityen_US
dc.rightsAll rights reserveden_US
dc.titleBehaviour of blind-bolted connections in concrete filled steel tubular columnsen_US
dcterms.abstractThe concrete filled steel tubular (CFST) members have been widely adopted in construction industry in the past few decades owing to its superior strength, ductility, and aesthetics. Its performance in better fire resistance and resisting higher loads in post-yield capacity have been the main reasons for its growing popularity. The performance of CFST members is dependent on composite action of the surrounding steel tube and the infill concrete. As in a realistic building the load is transferred from the floors to the column via the beam, it is therefore important to study the connection behaviour in a steel-beam and CFST column joint. The connections of the open-section steel beams with closed-section hollow or CFST columns are generally observed to be welded. But, the process of welding develops heat affected zones, and the fabrication is usually cumbersome requiring skilled manpower and thus expensive.en_US
dcterms.abstractThe bolted connections have gained several advantages over the welded connection due to easier and faster fabrication. For fabrication of open-beam to closed-section column connection, the standard bolts are not feasible as one cannot access the other end of the bolt, and therefore blind-bolts are used. The blind-bolts can be inserted and tightened from outside of the steel tube without accessing inside of the tube. But the usage of bolts has been limited due to its severe slippage and column surface deformation. Also, the bolted connections are usually referred to as pinned connections due to its insufficient moment-resisting capacity. Thus, developing a semi-rigid or rigid moment-resisting bolted connection has been a challenge for the structural engineers. Therefore, researchers recently modified the blind-bolts to enhance the connection performance and is observed to have potential for developing moment-resisting frames. The blind-bolts like Ajax Australia bolt and the Lindapter hollo-bolt have been modified by researchers in Australia and the United Kingdom with an extended shank and headed circular nut. The purpose of the extended shank with headed nut is to provide anchorage into the concrete core of the CFST column. The previous findings with hollo-bolted CFST column connections identified two primary failure modes: the bolt failure and column-face failure. But in an actual construction site condition, a combined failure mode would be developed, rather than a bolt failure or column face failure.en_US
dcterms.abstractTherefore, this current research has delved into an extensive investigation to explore the combined failure modes for both single and group anchored blind-bolted CFST connections under direct tensile loading. From preliminary studies, it is observed that concrete cone failure is the predominant mode of failure, therefore the interaction between anchored blind-bolts when in group needs was assessed with due consideration to the bolt pitch and gauge distances. The experimental programme is supported by material tests for all the connection components. Numerical simulations are also carried out to supplement the experimental data. It is observed that with an appropriate strength combination, the combined failure mode can be achieved, and displayed higher ductility. It was also seen that the connection stiffness is influenced by the width to tube thickness ratio, concrete strength, bolt diameter and bolt anchorage length. A component model based on non-linear behaviour of individual connection element is also presented that can predict the global connection behaviour. For the group of anchored bolted connection, it is observed that total connection strength cannot be determined by summation of individual bolt capacity. Also, a bolt anchorage length of 3.75 times bolt diameter may be adopted to achieve 60% connection capacity of the group bolt, and a minimum of 50% of the total applied loading was borne by the concrete, displaying enhanced composite behaviour.en_US
dcterms.abstractAs the bolts in a connection will be subjected to combined forces of tension and shear, and thus to understand this combination, the performance of extended hollo-bolts in pure shear was investigated. The influential benefit of extended hollo-bolt under shear loading is realised, and the existing design codes are assessed. With different bolt embedment lengths, the failure mode was consistent having fracture of bolt shank and sleeve along the shear plane, and full ultimate bolt capacity can be achieved. The shear load was significantly transmitted to the concrete core by bearing, and tube wall yielding was delayed.en_US
dcterms.abstractThe findings from this research will be able to provide directions towards developing moment-resisting bolted connections. This research is also expected to provide some insights towards load-introduction mechanism in bolted connections.en_US
dcterms.extentxxv, 232 pages : color illustrationsen_US
dcterms.isPartOfPolyU Electronic Thesesen_US
dcterms.issued2022en_US
dcterms.educationalLevelPh.D.en_US
dcterms.educationalLevelAll Doctorateen_US
dcterms.LCSHConcrete-filled tubes -- Jointsen_US
dcterms.LCSHConcrete construction en_US
dcterms.LCSHHong Kong Polytechnic University -- Dissertationsen_US
dcterms.accessRightsopen accessen_US

Files in This Item:
File Description SizeFormat 
6268.pdfFor All Users16.85 MBAdobe PDFView/Open


Copyright Undertaking

As a bona fide Library user, I declare that:

  1. I will abide by the rules and legal ordinances governing copyright regarding the use of the Database.
  2. I will use the Database for the purpose of my research or private study only and not for circulation or further reproduction or any other purpose.
  3. I agree to indemnify and hold the University harmless from and against any loss, damage, cost, liability or expenses arising from copyright infringement or unauthorized usage.

By downloading any item(s) listed above, you acknowledge that you have read and understood the copyright undertaking as stated above, and agree to be bound by all of its terms.

Show simple item record

Please use this identifier to cite or link to this item: https://theses.lib.polyu.edu.hk/handle/200/11812