Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor | Multi-disciplinary Studies | en_US |
dc.contributor | Department of Building and Real Estate | en_US |
dc.creator | Fu, Kwok-kwan | - |
dc.identifier.uri | https://theses.lib.polyu.edu.hk/handle/200/2925 | - |
dc.language | English | en_US |
dc.publisher | Hong Kong Polytechnic University | - |
dc.rights | All rights reserved | en_US |
dc.title | Current practice of design & build projects in Hong Kong | en_US |
dcterms.abstract | The so-called "Traditional" procurement method is no longer the only choice of the clients in Hong Kong, and many large projects are now procured in alternative ways. Design & Build (D&B) is one of the alternative methods commonly used in the local market. Due to the requirements of different projects, variants of D&B have evolved to cope with the needs of different clients. Three major variants of D&B are identified in Hong Kong: (1)Traditional D&B, (2)Enhanced D&B, (3)Novation D&B, and each of them has its own special features. In the research, the details of the variants are studied under the five work stages of D&B projects: (1) Client's Brief & Feasibility, (2) Outline Design, (3)Tendering, (4)Detail Design, and (5) Construction. The features of each of them are analyzed and compared under different study criteria. In order to obtain information about the current practice of the variants of D&B in Hong Kong, the following case studies were done: (1) Traditional D&B (a) Departmental Quarters at Lee On Road, Kwun Tong (b) Cheung Sha Wan Government Office Building (2) Enhanced D&B (a) North District Hospital (b) Tseung Kwan O Hospital (3) Novation D&B Sheung Shui Slaughterhouse The following conclusions are found in the research: (1) D&B could be equally applied in privately developed projects as well as Government projects. (2) Detailed pre-contract planning and administration works are crucial for improving the performance of D&B projects. (3) Commitment of project parties towards project success can improve the efficiency of issue resolution no matter which variant of D&B method is used. | en_US |
dcterms.extent | vii, 128, [15] leaves : ill. ; 31 cm | en_US |
dcterms.isPartOf | PolyU Electronic Theses | en_US |
dcterms.issued | 1999 | en_US |
dcterms.educationalLevel | All Master | en_US |
dcterms.educationalLevel | M.Sc. | en_US |
dcterms.LCSH | Construction contracts -- China -- Hong Kong | en_US |
dcterms.LCSH | Hong Kong Polytechnic University -- Dissertations | en_US |
dcterms.accessRights | restricted access | en_US |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
b14852354.pdf | For All Users (off-campus access for PolyU Staff & Students only) | 3.76 MB | Adobe PDF | View/Open |
Copyright Undertaking
As a bona fide Library user, I declare that:
- I will abide by the rules and legal ordinances governing copyright regarding the use of the Database.
- I will use the Database for the purpose of my research or private study only and not for circulation or further reproduction or any other purpose.
- I agree to indemnify and hold the University harmless from and against any loss, damage, cost, liability or expenses arising from copyright infringement or unauthorized usage.
By downloading any item(s) listed above, you acknowledge that you have read and understood the copyright undertaking as stated above, and agree to be bound by all of its terms.
Please use this identifier to cite or link to this item:
https://theses.lib.polyu.edu.hk/handle/200/2925