Full metadata record
DC FieldValueLanguage
dc.contributorDepartment of Computingen_US
dc.creatorHan, Bo-
dc.identifier.urihttps://theses.lib.polyu.edu.hk/handle/200/3812-
dc.languageEnglishen_US
dc.publisherHong Kong Polytechnic University-
dc.rightsAll rights reserveden_US
dc.titleThe design and the implement of a DRP consultation system for the middle size corporation including previous technical testing and surveyen_US
dcterms.abstractThis year, the most popular word in media is probably "The Disaster" all over the world, for example, the earthquake in Sichuan and the cyclone in Burma. In the IT and networking aspects, we are also facing potential "disasters". Suppose that a corporation intranet (e.g., campus network in university) is composed of multiple sites deployed in a city or different cities. All servers are running the same MIS (POS, CRM, etc) and they work and support each other. In such an intra-network, the failure of a network element, for example, a fiber, a server, or a router, etc, can cause the failure of a sub-network, thus leading to large data and service loss. For this reason, the Business Continuity Plan (BCP) and the Disaster Recovery Plan (DRP) have become a major concern for network service providers and have attracted more and more attention. Significant research and development effort, both in industry and in academic, are currently underway to address this topic. In my research, I first introduced the background of DRP. Then I designed a questionnaire to review the current DRP status of some major universities in China. After a brief analysis of the feedbacks, I started to explore the concepts of DRP, BCP, RTO, RPO, RTA etc.With the support of some DR solution companies, a set of compositive testing platform has been established. From the testing work, I summed up four abstract levels, including data DR level, DB DR level, SAN DR level and App DR level. Next, with the DR testing and the feedback of questionnaire, a DRP consultation system is designed for the people who do not know how to implement DRP. This system can be a helpful assistant for those IT managers to plan and to run their IT assets DR works. Finally, the conclusion and future work are summarized in Chapter 6. This dissertation focuses on not only technical section, but also management section. Some test and design works are based on the current IT environment of Xi'an Jiaotong University.en_US
dcterms.extent95 leaves : ill. ; 30 cm.en_US
dcterms.isPartOfPolyU Electronic Thesesen_US
dcterms.issued2008en_US
dcterms.educationalLevelAll Masteren_US
dcterms.educationalLevelM.Sc.en_US
dcterms.LCSHHong Kong Polytechnic University -- Dissertations.en_US
dcterms.LCSHCrisis management.en_US
dcterms.LCSHEmergency management.en_US
dcterms.LCSHBusiness -- Data processing -- Security measures.en_US
dcterms.LCSHInformation resources management.en_US
dcterms.LCSHComputer networks -- Security measures.en_US
dcterms.accessRightsrestricted accessen_US

Files in This Item:
File Description SizeFormat 
b22401805.pdfFor All Users (off-campus access for PolyU Staff & Students only)6.47 MBAdobe PDFView/Open


Copyright Undertaking

As a bona fide Library user, I declare that:

  1. I will abide by the rules and legal ordinances governing copyright regarding the use of the Database.
  2. I will use the Database for the purpose of my research or private study only and not for circulation or further reproduction or any other purpose.
  3. I agree to indemnify and hold the University harmless from and against any loss, damage, cost, liability or expenses arising from copyright infringement or unauthorized usage.

By downloading any item(s) listed above, you acknowledge that you have read and understood the copyright undertaking as stated above, and agree to be bound by all of its terms.

Show simple item record

Please use this identifier to cite or link to this item: https://theses.lib.polyu.edu.hk/handle/200/3812