dc.title | Concrete construction planning in consideration of time-sensitive properties of concrete | en_US |
dcterms.abstract | This dissertation proposes a method of concrete construction planning in consideration of time-sensitive concrete properties for fresh planner use. In this study, it consists of three main parts: part I is to introduce the background of construction planning and review the time-sensitive properties of concrete; part II is to perform concrete construction planning for a case study in consideration of time-sensitive properties of concrete and weather factor; part III is to conclude the dissertation and suggest the further study. Part I covers the following chapters. 1) Chapter I introduces the background of application of planning methods in construction industry, the existing problems in planning and the main objective of this study. 2) Chapter 2 introduces findings about the time-sensitive properties of concrete including the workability of RMC, development of strength, maturity of concrete, etc. According to the procedure of concrete construction, influences of time-sensitive properties of concrete are studied in different stages of concrete construction as considerations of every main activity planning, say RMC delivery. Concreting and Curing.. Part II as the core of this dissertation introduces the procedure of the proposed concrete construction planning in chapter 3. And it is imagined a construction project and then performs a concrete construction planning for this project by applying the proposed method in chapter 4. In this case study, concrete construction planning, which considers the time-sensitive properties of concrete studied, will be performed by application of the simulation tool of HKCONSIM and shown in precedence diagram method (PDM). In order to make the construction project complete, in the end, other activities such as formwork striking, steel works, formworks erection are added to the concrete construction plan with a rough expected duration to form a whole construction planning of a construction cycle of one typical floor. Part III, finally, in the end of part III, chapter 5 suggests some recommendations for the further study. | en_US |
dcterms.extent | x, 85 leaves : ill. ; 30 cm. | en_US |
dcterms.isPartOf | PolyU Electronic Theses | en_US |
dcterms.issued | 2009 | en_US |
dcterms.educationalLevel | All Master | en_US |
dcterms.educationalLevel | M.Sc. | en_US |
dcterms.LCSH | Hong Kong Polytechnic University -- Dissertations. | en_US |
dcterms.LCSH | Construction industry -- Planning. | en_US |
dcterms.LCSH | Concrete. | en_US |
dcterms.accessRights | restricted access | en_US |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
b2329758x.pdf | For All Users (off-campus access for PolyU Staff & Students only) | 18.22 MB | Adobe PDF | View/Open |
Copyright Undertaking
As a bona fide Library user, I declare that:
- I will abide by the rules and legal ordinances governing copyright regarding the use of the Database.
- I will use the Database for the purpose of my research or private study only and not for circulation or further reproduction or any other purpose.
- I agree to indemnify and hold the University harmless from and against any loss, damage, cost, liability or expenses arising from copyright infringement or unauthorized usage.
By downloading any item(s) listed above, you acknowledge that you have read and understood the copyright undertaking as stated above, and agree to be bound by all of its terms.
Please use this identifier to cite or link to this item:
https://theses.lib.polyu.edu.hk/handle/200/4121