Full metadata record
DC FieldValueLanguage
dc.contributorDepartment of Building and Real Estateen_US
dc.creatorCheng, Wai-lun Eddie-
dc.identifier.urihttps://theses.lib.polyu.edu.hk/handle/200/4271-
dc.languageEnglishen_US
dc.publisherHong Kong Polytechnic University-
dc.rightsAll rights reserveden_US
dc.titleA practical model for construction partneringen_US
dcterms.abstractThis thesis aims at developing a practical model for construction partnering. Systematised research activities are organised to develop and examine a conceptual model of partnering by means of surveying methods; to transform the conceptual model to a practical model for partnering espousal using a modelling technique; and to evaluate the practical model by employing comparative case study. As a result, the study provides a raft of contributions, both theoretical and practical. Firstly, it clarifies the definitions for strategic and project partnering. Secondly, a three-stage (Formation, Application, and Completion and Reactivation) conceptual model of partnering is proposed, while the posited critical success factors and performance criteria for the three-stage partnering process are tested. The results indicate that there are similar as well as different process characteristics between project and strategic partnering. More specifically, project and strategic partnering have a similar process and are affected by a common set of success factors, except for the Reactivation stage where there are specific factors affect the intention of involved parties to form further co-operation. Based on all findings, a practical model that integrates the key processes and associated components is developed by means of the Procedural Mapping Model (PMM). The Practical Model of Partnering (PMP) is composed of three major establishments including Interactive Process Description (IPD), Supporting Mechanisms (SMs) and Goals' Assessment Matrices (GAM). The IPD consists of six interactive processes, which are Representative Selection Process, Team Building Process, Partnering Agreement Process, Goals' Attainment Process, Joint Problem Solving Process, and Reactivation Decision Process. Also four common and four functional SMs are suggested to form. The four common SMs is used to sustain a high positive level of open communication, effective co-ordination, mutual trust and top management support for the whole partnering process. On the other hand, the four functional SMs (long-term commitment, continuous improvement, partnering experience and learning climate) are designed particularly for long-term co-operation (i.e. strategic partnering). GAM is used to audit the level of attainment of the partnering goals. The PMP has been evaluated by using two case study methods of real-life examples in Hong Kong. The results indicate that the materials of the PMP are appropriate to be adopted in Hong Kong. Although the scope of this thesis is not planned to ascertain the utility of the PMP in the contexts of other countries, this study has taken the first step to test its effectiveness. Finally, the thesis provides suggestions for future research and proposes new perspectives for construction partnering.en_US
dcterms.extentix, 270 leaves : ill. ; 30 cmen_US
dcterms.isPartOfPolyU Electronic Thesesen_US
dcterms.issued2001en_US
dcterms.educationalLevelAll Doctorateen_US
dcterms.educationalLevelPh.D.en_US
dcterms.LCSHConstruction industryen_US
dcterms.LCSHStrategic alliances (Business)en_US
dcterms.LCSHHong Kong Polytechnic University -- Dissertationsen_US
dcterms.accessRightsopen accessen_US

Files in This Item:
File Description SizeFormat 
b15574106.pdfFor All Users7.9 MBAdobe PDFView/Open


Copyright Undertaking

As a bona fide Library user, I declare that:

  1. I will abide by the rules and legal ordinances governing copyright regarding the use of the Database.
  2. I will use the Database for the purpose of my research or private study only and not for circulation or further reproduction or any other purpose.
  3. I agree to indemnify and hold the University harmless from and against any loss, damage, cost, liability or expenses arising from copyright infringement or unauthorized usage.

By downloading any item(s) listed above, you acknowledge that you have read and understood the copyright undertaking as stated above, and agree to be bound by all of its terms.

Show simple item record

Please use this identifier to cite or link to this item: https://theses.lib.polyu.edu.hk/handle/200/4271