Author: Sin, Ka-cheong Wilson
Title: Factors affecting the process quality in design, construction and maintenance of building projects in Hong Kong
Degree: M.Sc.
Year: 1999
Subject: Construction industry -- China -- Hong Kong -- Quality control
Total quality management -- China -- Hong Kong
Hong Kong Polytechnic University -- Dissertations
Department: Multi-disciplinary Studies
Department of Management
Pages: vi, 111 leaves : ill. ; 31 cm
Language: English
Abstract: The implementation of quality assurance system such as ISO 9000 or TQM is becoming more popular in the construction industry in Hong Kong but problems that are encountered in the implementation process continue to serious. Many buildings in Hong Kong are far below accepted standards. Quality deviations in design and construction process are usually appeared and affect the quality in operation and maintenance phase. The quality of entire project is a function of the quality of design; the construction; operation and maintenance. This dissertation presents the factors affecting process quality in three phases (design, construction, and operation and maintenance) of a building project. These factors are identified and ranked by the degree of importance. The perceptions of factors affecting quality from practitioners are obtained by means of a questionnaire survey. The findings indicate that management participation in promoting quality, training to all personnel, efficient teamwork within organization, feedback system to building professionals regarding the performance of buildings, all employee awareness and involvement, good designer education background and sufficient experiences of building professionals, and sufficient budgets in all phases of building process are the generic factors affecting quality. Building industry specific factors that are perceived by practitioners to enhance significantly the quality of building project includes well cooperation and coordination between parties in design and construction phases, consistent design drawings and specifications, good communications with owner, selecting appropriate designers and contractors, efficient supervision of sub-contracted works, and a detail as-fitted drawings and maintenance manual. Majority of the findings are in line with the Arditi's and Gunaydin's (1998) findings conducted in USA.
Rights: All rights reserved
Access: restricted access

Files in This Item:
File Description SizeFormat 
b14885086.pdfFor All Users (off-campus access for PolyU Staff & Students only)3.79 MBAdobe PDFView/Open


Copyright Undertaking

As a bona fide Library user, I declare that:

  1. I will abide by the rules and legal ordinances governing copyright regarding the use of the Database.
  2. I will use the Database for the purpose of my research or private study only and not for circulation or further reproduction or any other purpose.
  3. I agree to indemnify and hold the University harmless from and against any loss, damage, cost, liability or expenses arising from copyright infringement or unauthorized usage.

By downloading any item(s) listed above, you acknowledge that you have read and understood the copyright undertaking as stated above, and agree to be bound by all of its terms.

Show full item record

Please use this identifier to cite or link to this item: https://theses.lib.polyu.edu.hk/handle/200/5